Construction Planning – AR16

AR16 Construction Planning

Scope note:

This class comprises the beginning of the evolution of a set of activities that aim towards the articulation of an execution concept (AR3) in a series of construction plans (AR4) that aim to correctly incorporate a specific set of design documents (instance of AR1 Architectural Model) into a a plan to realize a built work (E22). The instance of this event begins when the MOe starts the activities of formulating the construction plan, with or without an external party participating, which may or may not include the MOa.

Examples:

The construction planning (ARx) for the realization of the the One World Trade Centre (E22) in New York undertaken by Tishman Construction (E74) based on the final designs (AR1) of the architect Daniel Libeskind in relation to the specified projective requirements of the Port Authority of New York and New Jersey and Larry Silverstein.

In First Order Logic:

  • AR16(x) ⊃ F27(x)

Scope Notes

Show Scope note Language Namespace View details Comments
This class comprises the beginning of the evolution of a set of activities that aim towards the articulation of an execution concept (AR3) in a series of construction plans (AR4) that aim to correctly incorporate a specific set of design documents (instance of AR1 Architectural Model) into a a plan to realize a built work (E22). The instance of this event begins when the MOe starts the activities of formulating the construction plan, with or without an external party participating, which may or may not include the MOa. en 0

Examples

Show Example Language Namespace View details Comments
The construction planning (ARx) for the realization of the the One World Trade Centre (E22) in New York undertaken by Tishman Construction (E74) based on the final designs (AR1) of the architect Daniel Libeskind in relation to the specified projective requirements of the Port Authority of New York and New Jersey and Larry Silverstein. en WIP 0

Additional notes

Show Notes Language Namespace View details Comments

Identifier : AR16

Labels

Label Language Last updated View details Comments
Construction Planning * en 2019-10-24 0

* : Standard label for this language

Namespace

Namespace Last updated
DSI Test ongoing 2019-12-04

Parent classes

Class Class namespace Relation defined in Justification View relation
F27 Work Conception FRBRoo version 2.4 DSI Test ongoing

Ancestor classes

Class Depth Class namespace
E1 CRM Entity 7 CIDOC CRM version 6.2
E1 CRM Entity 8 CIDOC CRM version 6.2
E2 Temporal Entity 6 CIDOC CRM version 6.2
E4 Period 5 CIDOC CRM version 6.2
E5 Event 4 CIDOC CRM version 6.2
E7 Activity 3 CIDOC CRM version 6.2
E63 Beginning of Existence 3 CIDOC CRM version 6.2
E65 Creation 2 CIDOC CRM version 6.2
E92 Spacetime Volume 6 CIDOC CRM version 6.2
E92 Spacetime Volume 7 CIDOC CRM version 6.2
SP1 Phenomenal Spacetime Volume 6 CRMgeo version 1.2
S15 Observable Entity 7 CRMsci version 1.2.3

Childs and descendant classes

Class Depth Class namespace

Related classes

Relation Class Justification Relation defined in View relation

Outgoing properties (this class is domain)

Domain Property identifier Range Namespace

Outgoing properties (inherited from ancestors)

Domain Property identifier Range Namespace
AR16 Construction Planning (is a E1 CRM Entity) P1 is identified by E41 Appellation CIDOC CRM version 6.2
AR16 Construction Planning (is a E1 CRM Entity) P2 has type E55 Type CIDOC CRM version 6.2
AR16 Construction Planning (is a E1 CRM Entity) P3 has note E62 String CIDOC CRM version 6.2
AR16 Construction Planning (is a E1 CRM Entity) P48 has preferred identifier E42 Identifier CIDOC CRM version 6.2
AR16 Construction Planning (is a E1 CRM Entity) P137 exemplifies E55 Type CIDOC CRM version 6.2
AR16 Construction Planning (is a E1 CRM Entity) L47 has comment E62 String CRMdig version 3.2
AR16 Construction Planning (is a E1 CRM Entity) L4 has preferred label E62 String CRMdig version 3.2
AR16 Construction Planning (is a E1 CRM Entity) L53 is not uniquely identified by E62 String CRMdig version 3.2
AR16 Construction Planning (is a E1 CRM Entity) histP31 time-independent entity association E1 CRM Entity CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
AR16 Construction Planning (is a E2 Temporal Entity) P4 has time-span E52 Time-Span CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P114 is equal in time to E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P115 finishes E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P116 starts E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P117 occurs during E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P118 overlaps in time with E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P119 meets in time with E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) P120 occurs before E2 Temporal Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E2 Temporal Entity) histP1 involves E1 CRM Entity CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
AR16 Construction Planning (is a E2 Temporal Entity) histP29 is component of (has component) E2 Temporal Entity CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
AR16 Construction Planning (is a E2 Temporal Entity) histP30 has identity defining component E1 CRM Entity CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
AR16 Construction Planning (is a E4 Period) P7 took place at E53 Place CIDOC CRM version 6.2
AR16 Construction Planning (is a E4 Period) P8 took place on or within E18 Physical Thing CIDOC CRM version 6.2
AR16 Construction Planning (is a E4 Period) P9 consists of E4 Period CIDOC CRM version 6.2
AR16 Construction Planning (is a E4 Period) Q1 occupied SP1 Phenomenal Spacetime Volume CRMgeo version 1.2
AR16 Construction Planning (is a E5 Event) P11 had participant E39 Actor CIDOC CRM version 6.2
AR16 Construction Planning (is a E5 Event) P12 occurred in the presence of E77 Persistent Item CIDOC CRM version 6.2
AR16 Construction Planning (is a E5 Event) O13 triggers (is triggered by) E5 Event CRMsci version 1.2.3
AR16 Construction Planning (is a E5 Event) O14 initializes (is initialized by) S16 State CRMsci version 1.2.3
AR16 Construction Planning (is a E5 Event) histP18 has event type histC4 Event type CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
AR16 Construction Planning (is a E7 Activity) P14 carried out by E39 Actor CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P15 was influenced by E1 CRM Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P16 used specific object E70 Thing CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P17 was motivated by E1 CRM Entity CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P19 was intended use of E71 Man-Made Thing CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P20 had specific purpose E5 Event CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P21 had general purpose E55 Type CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P32 used general technique E55 Type CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P33 used specific technique E29 Design or Procedure CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P125 used object of type E55 Type CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) P134 continued E7 Activity CIDOC CRM version 6.2
AR16 Construction Planning (is a E7 Activity) L29 has responsible organization E40 Legal Body CRMdig version 3.2
AR16 Construction Planning (is a E7 Activity) L30 has operator E21 Person CRMdig version 3.2
AR16 Construction Planning (is a E7 Activity) L34 has contractor E40 Legal Body CRMdig version 3.2
AR16 Construction Planning (is a E7 Activity) L35 has commissioner E40 Legal Body CRMdig version 3.2
AR16 Construction Planning (is a E63 Beginning of Existence) P92 brought into existence E77 Persistent Item CIDOC CRM version 6.2
AR16 Construction Planning (is a E65 Creation) P94 has created E28 Conceptual Object CIDOC CRM version 6.2
AR16 Construction Planning (is a E92 Spacetime Volume) P10 falls within E92 Spacetime Volume CIDOC CRM version 6.2
AR16 Construction Planning (is a E92 Spacetime Volume) P132 overlaps with E92 Spacetime Volume CIDOC CRM version 6.2
AR16 Construction Planning (is a E92 Spacetime Volume) P133 is separated from E92 Spacetime Volume CIDOC CRM version 6.2
AR16 Construction Planning (is a E92 Spacetime Volume) P160 has temporal projection E52 Time-Span CIDOC CRM version 6.2
AR16 Construction Planning (is a E92 Spacetime Volume) P161 has spatial projection E53 Place CIDOC CRM version 6.2
AR16 Construction Planning (is a F27 Work Conception) R16 initiated F1 Work FRBRoo version 2.4
AR16 Construction Planning (is a SP1 Phenomenal Spacetime Volume) Q3 has temporal projection SP13 Phenomenal Time-Span CRMgeo version 1.2
AR16 Construction Planning (is a SP1 Phenomenal Spacetime Volume) Q4 has spatial projection SP2 Phenomenal Place CRMgeo version 1.2
AR16 Construction Planning (is a S15 Observable Entity) O12 has dimension (is dimension of) E54 Dimension CRMsci version 1.2.3

Incoming properties (this class is range)

Domain Property identifier Range Namespace

Incoming properties (inherited from ancestors)

Domain Property identifier Range Namespace
E1 CRM Entity histP31 time-independent entity association AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
E2 Temporal Entity P114 is equal in time to AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P115 finishes AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P116 starts AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P117 occurs during AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P118 overlaps in time with AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P119 meets in time with AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity P120 occurs before AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM version 6.2
E2 Temporal Entity histP1 involves AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
E2 Temporal Entity histP29 is component of (has component) AR16 Construction Planning (is a E2 Temporal Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
E2 Temporal Entity histP30 has identity defining component AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
E4 Period P9 consists of AR16 Construction Planning (is a E4 Period) CIDOC CRM version 6.2
E4 Period Q1 occupied AR16 Construction Planning (is a SP1 Phenomenal Spacetime Volume) CRMgeo version 1.2
E5 Event O13 triggers (is triggered by) AR16 Construction Planning (is a E5 Event) CRMsci version 1.2.3
E7 Activity P134 continued AR16 Construction Planning (is a E7 Activity) CIDOC CRM version 6.2
E7 Activity P15 was influenced by AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E7 Activity P17 was motivated by AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E7 Activity P20 had specific purpose AR16 Construction Planning (is a E5 Event) CIDOC CRM version 6.2
E13 Attribute Assignment P140 assigned attribute to AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E13 Attribute Assignment P141 assigned AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E16 Measurement P39 measured AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E17 Type Assignment P41 classified AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E18 Physical Thing Q2 occupied AR16 Construction Planning (is a SP1 Phenomenal Spacetime Volume) CRMgeo version 1.2
E24 Physical Man-Made Thing P62 depicts AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E31 Document P70 documents AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E32 Authority Document P71 lists AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E36 Visual Item P138 represents AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E83 Type Creation P136 was based on AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E89 Propositional Object P129 is about AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E89 Propositional Object P67 refers to AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM version 6.2
E92 Spacetime Volume P10 falls within AR16 Construction Planning (is a E92 Spacetime Volume) CIDOC CRM version 6.2
E92 Spacetime Volume P132 overlaps with AR16 Construction Planning (is a E92 Spacetime Volume) CIDOC CRM version 6.2
E92 Spacetime Volume P133 is separated from AR16 Construction Planning (is a E92 Spacetime Volume) CIDOC CRM version 6.2
E93 Presence P166 was a presence of AR16 Construction Planning (is a E92 Spacetime Volume) CIDOC CRM version 6.2
histC1 Time-related Persistent Item Characteristic histP2 was initiated by AR16 Construction Planning (is a E5 Event) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
histC1 Time-related Persistent Item Characteristic histP3 was terminated by AR16 Construction Planning (is a E5 Event) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
histC2 Time-related geographical localisation histP12 is location of AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
F29 Recording Event R20 recorded AR16 Construction Planning (is a E2 Temporal Entity) FRBRoo version 2.4
F35 Nomen Use Statement R38 refers to thema AR16 Construction Planning (is a E1 CRM Entity) FRBRoo version 2.4
F40 Identifier Assignment R45 assigned to AR16 Construction Planning (is a E1 CRM Entity) FRBRoo version 2.4
F51 Pursuit R59 had typical subject AR16 Construction Planning (is a E1 CRM Entity) FRBRoo version 2.4
F52 Name Use Activity R63 named AR16 Construction Planning (is a E1 CRM Entity) FRBRoo version 2.4
SP7 Declarative Spacetime Volume Q12 approximates AR16 Construction Planning (is a E92 Spacetime Volume) CRMgeo version 1.2
SP11 Temporal Reference System Q19 has reference event AR16 Construction Planning (is a E5 Event) CRMgeo version 1.2
histC10 Name use in a language histP9 is appellation for language of (has appellation for language) AR16 Construction Planning (is a E1 CRM Entity) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing
S4 Observation O16 observed value (value was observed by) AR16 Construction Planning (is a E1 CRM Entity) CRMsci version 1.2.3
S4 Observation O8 observed (was observed by) AR16 Construction Planning (is a S15 Observable Entity) CRMsci version 1.2.3
S6 Data Evaluation O11 described (was described by) AR16 Construction Planning (is a S15 Observable Entity) CRMsci version 1.2.3
S21 Measurement O24 measured (was measured by) AR16 Construction Planning (is a S15 Observable Entity) CRMsci version 1.2.3
S22 Segment of Matter O23 is defined by (defines) AR16 Construction Planning (is a E92 Spacetime Volume) CRMsci version 1.2.3
D2 Digitization Process L60 documents AR16 Construction Planning (is a E1 CRM Entity) CRMdig version 3.2
D29 Annotation Object L43 annotates AR16 Construction Planning (is a E1 CRM Entity) CRMdig version 3.2
histC25 Participation histP27 is participation in AR16 Construction Planning (is a E5 Event) CIDOC CRM Generic Extension for Historical Data Management and Interoperability, ongoing

Profiles using this class

Label Start date End date Last updated

Linked classes graph

Use mouse wheel to zoom in/out.

Comments